BOUTILLIER, Michel (1990), A Joint Estimation of
Demand for Investment and Labor. In: Artus, P., Muet, P.A. (eds.): Investment and Factor
Demand, S. 123-144.
ZIMMERMANN, Klaus F. (1989), Technolog
Fra
Ger
Ire
Ita
Jpn
Nld
Nzl
Nor
Esp
Swe
Gbr
Usa
0
1
2
3
E
P
I/F
itt
ed
v
al
ue
s
0 20 40 60 80
REI
OECD versus Worldbank
We take [...]
7 The C tests do not reject the null of the exogeneity of the labour market institutions with the p-values of 93% (RW2)
and 97% (RW1).
page
14
Taking all estimation results together [...] Applied Production Analysis. Cambridge University Press, Cambridge.
Eichenbaum, M., Hansen, L. P. and K. J. Singleton (1988), A Time Series Analysis of Representa-
tive Agent Models of Consumption
supplemented by taking a supply relation into consideration:
page
4
P
CV
Y
=
∂
∂
*Θ , (4)
where P represents the output price and Θ the mark-up over the marginal costs. The price [...] may depend on the growth rate of output.
For this reason we specify the price equation as
( )P w
CV
YY= +β β
∂
∂0 1 (20)
with Yw as the growth rate of real output.
Our investigation [...] 2: Summary statistics
Equation R2 Durbin-Watson ARCH CUSUM Jarque-Bera
CV
L/Y
M/Y
P
0.9997
0.9965
0.9850
0.9967
1.2695
1.1162
1.5771
1.4471
0.147
0.618
Dokument3 SS Prof. Dr. Horst Rottmann
1
Literatur
• Mankiw, N. Gregory, Taylor, Mark P. (2006), Economics, 4th ed.
dt. Übersetzung: Mankiw, Grundzüge der Volkswirtschaftslehre (2008)
use the maximum likelihood random-effects estimator
Standard errors in parentheses, * p < 0.10, ** p < 0.05, *** p < 0.01
r2_o: R2 overall; r2_w: R2 within; r2_B: R2 between.
F-Value: F-test for H0: [...] N 671 671 671 671 671
AIC 2402 1936 1919 1829 1845
Standard errors in parentheses, * p < 0.10, ** p < 0.05, *** p < 0.01
All models of table 3 are estimated for the period 1960 to 2000
We use the maximum [...]
Figure 1: Employment Protection Index in selected OECD countries
0
1
2
3
E
m
pl
. P
ro
te
ct
io
n
A
lla
rd
1960 1970 1980 1990 2000
year
austria france
germany netherlands
an
d-
H
P1
00
30 40 50 60 70
Tax Wedge
95% CI Fitted values
hp100_su
Between Data
Unemployment and Institutions
-5
0
5
10
15
U
E-
R
at
e-
S
ta
nd
-H
P
10
0
[...] Indikator des
Kündigungsschutzes (Allard).
0
5
10
15
U
E
-R
at
e-
S
ta
nd
-H
P
10
0
0 20 40 60 80 100
Replacement 1 Year
95% CI Fitted values
hp100_su
Within Data
Unemployment [...] das Größenniveau der Variablen zu erhalten.
0
5
10
15
U
E-
R
at
e-
St
an
d-
H
P
10
0
-1 0 1 2 3
Empl. Protection Allard
95% CI Fitted values
hp100_su
Within Data
Unemployment
einzelnen Länder in Kilometern; Quelle:
http://www.indo.com.
Literatur
Agarwal, J.P., Determinants of Foreign Direct Investment: A Survey, Weltwirtschaftliches
Archiv, Vol. 116, 1980 [...] 1988.
Dunning, J.H., Multinational Enterprises and the Global Economy, Wokingham, u.a. 1994.
Egger, P., European Exports and Outward Foreign Direct Investment: A Dynamic Panel Data
Approach, Weltwi [...] estfälischen Instituts für Wirtschaftsforschung, N.F., 1999, S. 129-148.
Jost, T., Nunnenkamp, P., Bestimmungsgründe deutscher Direktinvestitionen in
Entwicklungs- und Reformländern – Hat sich wirklich
Stillhal-
terposition bei einer Verkaufsoption (Put P) auf die Assets
des Unternehmens mit Ausübungspreis B und Laufzeit T ist.
(3) DT = B – PT <–> D = B – P
(1+i)T
Es ist nun aus der Optionspreistheorie [...] of Credit Rating Announcements«,
Journal of Banking and Finance 28, 2813–2843.
Perraudin, W. und A.P. Taylor (2004), »On the Consistency of Ratings and
Bond Market Yields«, Journal of Banking and Finance
parentheses, are clustering on individual firms in the
case of the pooled model (1).
∗ p < 0.05, ∗∗ p < 0.01, ∗∗∗ p < 0.001
11
page
Figure 1: Coefficients on Time Dummies
−
2
.5
−
[...] 6
in
p
e
rc
e
n
t
2003m7 2005m1 2006m7 2008m1 2009m7
Average government bond rate
over three–month treasury bills rate
0
1
2
3
p
e
rc
e
n
ta
g
e
p
o
in
ts [...] 56946 34013
AIC 51583.03 30457.26
LogL -2.6e+04 -1.5e+04
t statistics in parentheses
∗ p < 0.05, ∗∗ p < 0.01, ∗∗∗ p < 0.001
22
page
interaction. The columns to the right of the first column
and Original Sample
Original Sample Estimation Sample
Variable Obs Mean p25 Median p75 Obs Mean p25 Median p75
Employment 31,885 445 39 100 275 7536 654 45 129 353
Innovation 31,420 0 [...] (205) 191 (205)
Sargan p-Value (0.035) (0.734) (0.754)
AR(1) -2.780*** -2.911*** -2.779***
AR1 p-Value (0.005) (0.004) (0.005)
AR(2) -0.640 -0.863 -1.199
AR(2) p-Value (0.522) (0.388) (0 [...] Freedom) 192 (205) 183 (205)
Sargan p-Value (0.741) (0.866)
AR(1) -2.933*** -2.942***
AR1 p-Value (0.003) (0.003)
AR(2) -0.251 -1.625
AR(2) p-Value (0.802) (0.104)
* significant
Fra
Ger
Ire
Ita
Jpn
Nld
Nzl
Nor
Esp
Swe
Gbr
Usa
0
1
2
3
E
P
I/
F
it
te
d
v
a
lu
e
s
0 20 40 60 80
REI
OECD versus Worldbank
We
Tests an Macht (Power) gewin-
nen. Beispielsweise nimmt der Standardfehler für das zu
schätzende JA c. p. proportional zur Wurzel aus der An-
zahl der Beobachtungen ab. Gegen einen sehr langen Be-
obachtu [...] praktischen Anwendungen in Fi-
nanzanalyse und Portfoliomanagement, Uhlenbruch Verlag, 2001.
Reichling, P., Performance: Glück oder Können, in: WiSt – Wirt-
schaftswissenschaftliches Studium, 25. Jg. (1996)
of European Unemployment: The Aggregate Evidence«, Economic
Journal 110, C1–C33.
Blanchard, O. und P. Portugal (2001), »What Hides Behind an Unemploym-
ent Rate: Comparing Portugese and U.S. Labor Markets«
page Tabelle
Datenquelle
r1 r2 r3 r4
XA XB E(RP) sP sP sP sP
0,000 1,000 5,00 15,00 15,00 15,00 15,00
0,001 0,999 5,00 15,01 [...] Creation-Date 1996-10-17T05:27:31Z
resourceName /var/www/public/files/oth-aw/Professoren/Rottmann/P_Portfoliomoeglichkeitenkurven.xls
dcterms:created 1996-10-17T05:27:31Z
Last-Author Horst Rottmann
sample and original sample.
Original sample Estimation sample
Variable Obs Mean p25 Median p75 Obs Mean p25 Median p75
Employment 31,885 445 39 100 275 9682 608 45 129 350
Innovation 31,420 0.494 [...] (205)
191
(205)
Sargan p-value (0.035) (0.734) (0.754)
AR(1) −2.780⁎⁎⁎ −2.911⁎⁎⁎ −2.779⁎⁎⁎
AR1 p-value (0.005) (0.004) (0.005)
AR(2) −0.640 −0.863 −1.199
AR(2) p-value (0.522) (0.388) (0.230) [...] 250
(347)
286
(275)
Sargan p-value (0.720) (1.000) (0.305)
AR(1) −2.92⁎⁎⁎ −3.03⁎⁎⁎ −3.00⁎⁎⁎
AR1 p-value (0.004) (0.002) (0.003)
AR(2) −0.89 −0.92 −0.89
AR(2) p-value (0.371) (0.360) (0.375)
KRAMARZ, Francis, SEVESTRE, Patrick (1996), Dynamic Labour
Demand Models. In: Matejas, L., Sevestre, P. (eds.), The Econometrics of Panel Data. A
Handbook of the Theory with Applications, 2nd rev. ed.,
Microeconometric Evidence, ZEW Discussion Paper 04(73).
Petit, P. (1995), Employment and Technological Change, in: Stoneman, P. (ed),
Handbook of the Economics of Innovation and Technological Change [...] for West German manufacturing firms, Journal of Industrial
Economics 46(3), 359-382.
Stoneman, P. (1983), Economic Analysis of Technological Change, Oxford University
Press.
Sutton, J. (1997),
time t:
xi t xi pi t P i t qi t Q i t Zi t( ) ( ( ), ( ), ( ), ( ), ( ))= − − , (1)
with x x x xi i i i1 2 3 40 0 0 0< > > <, , , .
pi(t) denotes the firm’s product price, P-i(t) is the vector of [...]
culated. The unconditional labour demand of firm i, li, is given by:
li t li tei t qi t Q i t P i t wi t uci t Zi t( ) ( ( ), ( ), ( ), ( ), ( ), ( ), ( ))= − − , (4)
with l l l l l li i i i i [...] design can lessen the impact of self selection of firms in the sample. See e.g.
Arellano/Bond (1991), p. 281.
14 This sample with 6405 observations is also the basis for the econometric estimation.
15 Kö
effektiv realisiert werden.
Literatur und Quellenangaben
[1] Recum J, Wendl K, Vock B, Grützner P. A., Franke J.
(2012). Intraoperative 3D C-arm imaging. State of the
art. Unfallchirurg. 2012 Mar; [...]
Radiology. 2004 Oct; 233 (1): 67–78. Epub 2004 Aug 18.
[3] Gebhard, F., Riepl, C., Richter, P., Liebold, A., Gorki, H.,
Wirtz, R., König, R., Wilde, F., Schramm, A., Kraus, M.
(2012). Der Hyb [...] No. 4, E344–348, PMID
17650462 (PubMed-indexed for MEDLINE)
[6] Galantowicz M. & Cheatham J. P. (2005). Lessons Lear-
ned from the Development of a New Hybrid Strategy for
the Management of Hypoplastic
Diplom-
arbeiten und den Einstieg ins
W
ir
ts
ch
af
ts
st
an
d
o
rt
O
b
er
p
fa
lz
N
E
W
S
L
E
T
T
E
R
0
1
|0
5
Lockere Stimmung auf dem Career Day
[...] Unternehmens-
gründungen mit
4350 Arbeitsplätzen
Nutzen für die einheimische Wirtschaft
K
o
m
p
et
en
z
&
I
n
n
o
va
ti
o
n
Fachhochschule Amberg-Weiden 3
Auch nach Ablauf [...] wittmann@wilden.com
Internet: www.wilden.de
Global Player aus der Oberpfalz
Fi
rm
e
n
p
o
rt
rä
t
Fachhochschule Amberg-Weiden 5
gerufen. »Wir suchen händeringend
Ingenieure in
an der OTH in Amberg.
»Die Idee entstand vor
rund zwei Jahren«, erzählt
Prof. Dr.-Ing. Andreas P.
Weiß, Fakultät Maschinen-
bau/Umwelttechnik. »Wir ha-
ben eine Anfrage aus Tschechi-
en bekommen: [...] Brücke zwischen
böhmischen und baye-
rischen Hochschulen zu
wirken«, sagt Prof. Dr.-Ing.
Andreas P. Weiß. »Die Ener-
giewende, an der die OTH Am-
berg-Weiden seit Jahren aktiv mit-
arbeitet, ist nur [...] im Bereich der
Erneuerbaren Energien und der
Kraft-Wärme-Kopplung.«
Prof. Dr.-Ing. Andreas P. Weiß
Tschechisch-bayerische
Kooperation
Newsletter 2|2015 4 OTH weltweit
page
Der
2000.
Archer, N.P.; Ghasemzadeh, F., 1999: An Integrated Framework for Project Portfolio Selection.
International Journal of Project Management (17:4), S. 207-216.
Artto, K.A.; Dietrich, P.H.; Nurminen [...] gen. In (Hummel, M.): Handbuch
Dienstleistungsmanagement, Gabler, Wiesbaden. S. 55.
Cebon, P.; Newton, P., 1999: Innovation in firms: towards a framework for indicator
development. Melbourne Business [...] Aumayr betont, dass die Produktstrategie Bestandteil der Marketing-Mix-
Strategien ist (Aumayr, 2016, p. 234). In der Literatur wird PPM häufig als Bestandteil
der Produktstrategie gesehen. Entscheidungen
Nonprofit-
Organisationen, Eschborn, 2006
Hemp, P.: Präsentismus – Krank am Arbeitsplatz, Harvard Business Review,
21.12.2004, S. 47 – 60
Höher P., Höher F.: Konfliktmanagement, Freiburg, Berlin [...] barometer-2007
Kaplan, R.S., Norton, D.P., Steffens, D.: Der Weg von immateriellen Werten zu
materiellem Erfolg, Stuttgart, 2004
Kaplan, R.S., Norton, D.P.: Alignment. Mit der Balanced Score Card [...] sind das Kapital; Heidelberg, 2007
Reinker, S.: Rache am Chef; Berlin, 2007
Rothlin, P.H., Werder, P.R.: Diagnose Boreout; Heidelberg, 2007
Schmelzer, H.J, Sesselmann, W.: Geschäftsprozessmanagement
ergibt sich als kompensierendes Konsumniveau:
(31) *f,� = *3,� n) �o- ! o�p]^,��)��p-/p
) �o- ! o�p]��)��p-/pq
/) �r-
Die CRRA-Nutzenfunktion erzeugt die Geldnachfragefunktion
(32) [...] erhält man das
kompensierende Konsumniveau:
(A3.4) *f,� = *3,� n) �o- ! o�p]^,��)��p-/p
) �o- ! o�p]��)��p-/pq
/) �r-
Aus (A3.2) erhält man für eine gegebene Substitutionselastizität [...] Geldumlauf (Mt) folgende
Schätzung für den Verteilungsparameter a:
(A3.5) ?l = ]� m�p��p!]� m�p
Für σ = ρ = 1 ergib sich (30‘) als Spezialfall.
page
9 Vgl. Kistner, K.-P., Steven, M., (2001), S. 7
10 Vgl. ebenda
11 Vgl. Kistner, K.-P., Steven, M., (2001), S. 7f.
12 Vgl. Kistner, K.-P., Steven, M., (2001), S. 8f
page [...] Beispiel des Kotflügels dargestellt.
Pn (Losgröße/ ann. Gesamtkosten)
P1 (3788/14.107€) P2 (3409/14.330€) P3 (4166/14.026€)
Es ergeben sich die drei Funktionen:
Y = ax² + bx + c